Home      Experience      Energy Saving
 
Grass Root Plant
 
  Capacity Upgrading
   
  Energy Saving
   
  Flare Load Analysis Project
   
  Feasibility Study
   
  EPC
   
 
Energy Saving
Project Name Plant Description Scope of Work Client / Country Completed
VA Purification Improve for VA Recovery Project (#2) EVA Vinyl Acetate Purification Improve for VA Recovery BE STC Korea 2014.08
NCC #3 Energy Saving Project NCC NCC Plant
Energy Saving : 3.485 MMkcal/hr
BE YNCC Korea 2014.04
NCC #1 Energy Saving Project NCC NCC Plant
Energy Saving : 19 MMkcal/h
BE YNCC Korea 2014.04
 NCC Energy Saving Project NCC Energy Saving Project Daesan BE LG Chem Korea 2011.03
 HPC Daesan
Energy Saving Project
NCC/BRU
BD/EG
NCC/BRU/BD/EG Plant
Energy Saving : 70.5 MMkcal/h
BE HPC Korea 2011.01
Incheon CLX Project Oil Refinery Refinery Plant
Energy Saving : 7 MMkcal/h
BE SK E&C Korea 2010.11
SM Energy Saving Project SM Steam Integration
HPS to MPS : 5.7 MMkcal/h
BE STC Korea 2010.05
#1 CDU Optimization Project Crude Refinery CDU Plant
Energy Saving : 14 MMkcal/h
BE H-Oil Bank Korea 2010.04
 NCC Energy Saving Project NCC NCC Plant
Energy Saving : 30.8 MMkcal/h
BE STC Korea 2009.09
 SM Energy Saving Project SM SM Plant
Energy Saving : 5.918MMkcal/hr
BE STC Korea 2008.12
M-X Energy Saving Project NCC / BRU NCC/BRU Plant
Energy Saving : 15.44 MMkcal/h
BE LG Chem Korea 2008.04
BE : BASIC ENGINEERING.