Project Name Plant Description Scope of Work Client / Country Completed
DA-202 O/H Vapor Route Change Project NCC DA-202 O/H Vapor Route Change BE YNCC Korea 2013.06
A-530 QW Reboiler Addition Project NCC A-530 QW Reboiler Addition BE YNCC Korea 2013.05
DE Maximization Process SM   Dilute Ethylene 40,000 kg/h BE STC Korea 2013.04
HR Project LLDPE N-Hexane Recovery(3rd)
26,000 kg/h Feed Base
BE/DE STC Korea 2013.03
Bio-Butanol Solvent Dehydration Project Bio-Butanol Bio-Butanol Solvent Dehydration BE Hanwha Chemical Korea 2012.12
NR Project LLDPE N-Hexane Recovery(2nd)
16,000 kg/h Feed Base
BE/DE STC Korea 2012.09
BN-1 Process Improvement
Project
BN-1 BN-1 Plant Capa-Up
9,000 kg/h to 14,000 kg/h
BE HPC Korea 2012.01
 DCU Cold VR Operation
Mode Study Project
DCU Cold VR Feed Operation
Improvement
BE H-Oil Bank Korea 2011.05
 Butene-1 Expansion project YNCC Butene-1 Plant
17,560 kg/h Feed Base
BE/DE YNCC Korea 2010.08
NCC#1 C3 LPG
Treatment Project
NCC C3 LPG Treatment Unit
4,500 kg/h Product Base
BE YNCC Korea 2010.08
 C3 FRACTIONATOR
#3 Project
NCC Propylene Fractionator
150,000 MTA Product Base
BE/DE STC Korea 2010.06
 BD Process Upgrade Engineering
Study Projcet
NCC C4 Plant Capa-Up
39 ton/h to 54.45 ton/h
BE STC Korea 2010.03
HPC BTX Modification Project BRU Modification from BX to BTX Plant
73,055 kg/h Feed Base
BE HPC Korea 2010.01
 #3 NCC 2nd
Debottleneck Project
NCC NCC Plant Capa-Up
155 ton/h to 175 ton/h
BE YNCC Korea 2009.04
 N-Hexane Capa-Up
Project
LLDPE N-Hexane Recovery(1st)
10,300 kg/h Feed Base
BE STC Korea 2008.02
 BRU/BD Revamping Project BRU/BD BD Plant 57 ton/h to 93 ton/hr
BRU Plant 43.5 ton/h to 47.85 ton/h
BE HPC Korea 2007.12
Kero-Merox Revamping Project Kero-Merox
Unit
Kero-Merox Plant
7,000 to 10,000 BPSD
BE H-Oil Bank Korea 2007.12
#1 NCC EXPANSION BTX
H/E Design
NCC/BTX Heat Exchange Design BE YNCC Korea 2006.12
Crude Unit Capacity
Upgrading Project
CDU Simulation of #3 CDU, NHT
For Light Naphtha additional
feed to CDU
BE GS-Caltex Korea 2006.08
#3 CDU Improvement Project CDU
VDU
NHT
Simulation , Thermal Ratintg
Column Internal Check
Modification of Equipment DS
BE GS-Caltex Korea 2005.11
#1 NCC Process Simulation
for Capacity Upgrading
NCC/BTX Simulation Modeling for
Capacity Upgrading
BE YNCC Korea 2005.08
New Incheon Refinery
VOC Recovery Project
Oil
Refinery
VOC Recovery Unit BE Incheon Oil Refinery
Korea
2004.04